Shipment and installation of the first fully automatic enameling line for dual-tank instant-heating water heaters
2025-06-10 08:46
TIMS

Shipment and installation of the first fully automatic enameling line for dual-tank instant-heating water heaters
The gas enamel furnace part of the first full-set production line for double-tank rapid-heating water heater liners, which includes automatic loading/unloading, automatic enameling, drying, and firing processes, contracted by Tianmeixin Company, was successively shipped to Qingdao Haier Smart Electrical Equipment Co., Ltd. (Haier Sino-German Water Heater Factory) for installation on August 19, 20, and 21, 2022. It is expected to be put into operation three months later. The full-set production line was awarded the bid on June 20, 2022, and with the joint efforts of all staff in our company, it only took two months from bid award to shipment and installation, creating a new historical record for TIMS.
Introduction to Natural Gas-Fired Enamel Furnace for Double-Tank Water Heater Enamel Liners
Core Technology of the Gas Enamel Furnace
Industry Significance
Recommended news

2025-06-03 14:01
TIMS Expands Its Horizons, co - create infinity
TIMS Expands Its Horizons, co - create infinity

2025-04-18 22:57
Lieferung einer Produktionslinie für High-End-Beschichtungsanlagen aus Mexiko
Lieferung einer Produktionslinie für High-End-Beschichtungsanlagen aus Mexiko

2025-04-18 23:14
The information technology air conditioning powder coating line of a multinational group constructed by TIMS in Thailand has begun to be shipped
The information technology air conditioning powder coating line of a multinational group constructed by TIMS in Thailand has begun to be shipped
share to